Specs
Dual Zone Router specs
Setup notes and briefing numbers for Dual Zone Router.
Dual-bed layout and cutting envelope
The Dual Zone Router specifications set out the working details in a clear format. Check bed layout, cutting capacity, and the practical requirements before installation.
Check how the Dual Zone Router is set up before it enters your shop. Focus on the split bed arrangement, usable cutting area, gantry clearance, spindle configuration, and the service space needed around the machine. MDF, plywood, aluminium composite panel, plastics, and other sheet materials all place different demands on hold-down, dust extraction, and feed settings.
Before installation, measure door openings, forklift access, and the final machine position against the bed size shown here. Power supply, extractor placement, compressed air, and cable routing should be sorted before the machine is offloaded. In coastal areas, cabinet sealing and corrosion checks matter more, while inland shops usually need stricter dust control around rails and drives.
What to verify on this router
Use these specifications to confirm whether the machine suits nested board cutting, panel processing, repetitive production, or mixed-sheet work. The dual-zone format helps when one side is being loaded while the other side is cutting, so bed zoning and vacuum performance need proper attention. Tool length, spindle power, and material thickness should be checked together rather than as separate items.
Read the machine details here alongside installation requirements and sample cutting needs before you finalise anything. Compare table zoning, spindle options, pump requirements, and extraction capacity with the jobs you run every day. If you need to ask about this model through the contact form, include the material type, sheet size, and site location.
Workshop conditions that affect setup
South African workshops often need to fit a router into active production spaces with limited room for offloading and assembly. Check slab condition, access for rigging, and the turning space for full sheets before confirming the install position. If the machine will sit near sanding, spraying, or heavy timber processing, protect the control cabinet and linear components from airborne dust.
Load-shedding planning matters when homing, vacuum restart, and first-part verification are part of the day-to-day routine. Coastal humidity changes maintenance intervals for exposed metal parts, while dry inland conditions usually increase fine dust around sensors and cable tracks. A proper handover should include operating checks on both zones, not only a short single-sheet cut.
Operated by Astros Marketing (Pty) Ltd from 2 Makro Place, Sunnyrock 1401.
Numbers worth checking first
Start with the working area, maximum material thickness, spindle details, and vacuum zone arrangement. Then confirm machine footprint, overall height, and the clearance needed for loading full sheets safely.
Keep your site measurements, electrical information, and extraction details together when planning the install. It also helps to compare the listed capacity with the cutter sizes and board materials you expect to run most often.
What our CNC Machinery customers say
Verified Google reviews
